İsmetpaşa Mh. Asaf Paşa Cd. No: 78
Merkez/Çanakkale
The Identity of Investment | ||
Subject of the Project | District Heating System with Cogeneration in Çan Thermal Power Plant | |
Information about the Product/Service |
Heat Energy |
|
Investment Location (ProvinceDistrict) | Çanakkale (Çan) | |
Technical Capacity of the Facility |
117,260 MWh Annual Heat Energy at Actual Capacity |
|
Fixed Investment Cost | 6.881.607,05 Dollars | |
Investment Period | 12 Months | |
Economic Capacity Utilization Rate of the Sector | 90% | |
Employment Capacity |
8 Staff |
|
Payback Period of Investment |
8,23 Years |
|
NACE Code of the Product/Service (Rev.3) |
35.30.21 |
|
Harmonized Code (HS) of the Product/Service |
- |
|
Target Country of Investment |
Çan District-Çanakkale Province-Türkiye |
|
Impact of the Investment on Sustainable Development Goals (UNDP) | Direct Effect | Indirect Effect |
Goal 9: Industry, Innovation and Infrastructure |
Goal 11: Sustainable Cities and Communities |
|
Other Related Issues | The exchange rate was taken as 13,50 TRY. |